- SolutionsGuest room energy managementHeating and hot water optimisationSolar control window filmControls and building efficiencyLED lighting as a serviceCommercial energy auditThermal drone surveysBeer line waste reductionEnergy monitoringEnergy procurementSolar and battery storageESOS complianceESOS compliance routesESOS in Dorset and HampshireISO 14001 and 50001ESG reporting and certificationThird-party verification
- Sectors
- Case Studies
- Insights
- About
- Contact
Case studies: real buildings, real results.
See how hotels and commercial buildings have cut energy costs and carbon, with practical solutions fitted quickly and with minimal disruption.
The results shown here belong to our technology partners. We include them as evidence of what the solutions we recommend can deliver, not as Evolution NetZero projects. Each case study states which figures were measured and which are projected, and results will vary by building.
Four hotels, four different challenges
Each case study sets out the challenge, what changed, the financial impact and the disruption involved.
The Georgian House Hotel
- The challenge
- Gas use across five plant rooms in a historic Pimlico building, with a restaurant and guests to protect.
- What changed
- Heating optimisation fitted across all five plant rooms, with a guarantee that installation costs would not exceed year-one savings.
- Disruption
- No disruption to guests or restaurant operations.
Voco St David’s
- The challenge
- Eight floors of south-facing glazing (1,400m²) overheating, with curtains drawn all day and rooms too hot to use.
- What changed
- Low-E solar control film applied to the existing glass from the inside.
- Disruption
- No scaffolding, no structural works and no disturbance to guests.
The Priest House Hotel
- The challenge
- LPG and oil use across three plant rooms in a historic country hotel and estate housing.
- What changed
- Heating optimisation fitted across all three plant rooms, with a guarantee that installation costs would not exceed year-one savings.
- Disruption
- Total installation time of 2.5 hours.
The Headland Hotel
- The challenge
- Heating and hot water costs across a large estate, including 40 holiday cottages.
- What changed
- Heating and hot water optimisation across the estate, phased in two stages around peak cottage lettings.
- Disruption
- No days of disruption, with installation worked around lettings.
Savings are shown as stated in each published case study, measured or projected as labelled there. Results come from solutions we recommend and arrange through specialist partners.
Want results like these for your building?
Get a free, no-obligation Cost & Energy Waste Report, a limited-time offer, and we will show you where your building is losing energy and what it is costing you.
Vendor-agnostic energy waste reduction for hotels, commercial buildings and multi-site operators.
Results shown on this site are delivered by our technology partners’ solutions.

Services
- Hotel Energy Management
- Care Home Energy Management
- Student Accommodation
- Commercial Landlords
- Hospitality & Pubs
- ESOS Compliance
- ESOS Compliance Routes
- ESOS Dorset and Hampshire
- Commercial Energy Audit
- Energy Monitoring
- Energy Procurement
- Solar Control Window Film
- Controls and Building Efficiency
- LED Lighting as a Service
- Thermal Drone Surveys
- Beer Line Waste Reduction
- ISO 14001 and 50001
- Green Key Certification
Resources
Contact
Evolution NetZero Limited
The Stables
Blandford
Dorset DT11 8SU