See how hotels and commercial buildings have cut energy costs and carbon, with practical solutions fitted quickly and with minimal disruption.

50%Air conditioning reduction, supplier-reported (Voco St David’s)
£54,191Projected annual saving (The Headland Hotel)
23%Gas reduction, measured (The Georgian House Hotel)
17.2%Fuel reduction, measured year one (The Priest House Hotel)
About these case studies

The results shown here belong to our technology partners. We include them as evidence of what the solutions we recommend can deliver, not as Evolution NetZero projects. Each case study states which figures were measured and which are projected, and results will vary by building.

Proven in real buildings

Four hotels, four different challenges

Each case study sets out the challenge, what changed, the financial impact and the disruption involved.

Boutique hotel · Pimlico, London

The Georgian House Hotel

23%Gas reduction
£9,200Projected annual saving
3 hrsInstallation
The challenge
Gas use across five plant rooms in a historic Pimlico building, with a restaurant and guests to protect.
What changed
Heating optimisation fitted across all five plant rooms, with a guarantee that installation costs would not exceed year-one savings.
Disruption
No disruption to guests or restaurant operations.
Read the full case study
5-star hotel · Cardiff Bay

Voco St David’s

50%Air conditioning reduction
62%Solar rejection
69%Glare reduction
The challenge
Eight floors of south-facing glazing (1,400m²) overheating, with curtains drawn all day and rooms too hot to use.
What changed
Low-E solar control film applied to the existing glass from the inside.
Disruption
No scaffolding, no structural works and no disturbance to guests.
Read the full case study
Country hotel · Castle Donington

The Priest House Hotel

17.2%Fuel reduction, year one
£5,347Year-one saving
2.5 hrsInstallation
The challenge
LPG and oil use across three plant rooms in a historic country hotel and estate housing.
What changed
Heating optimisation fitted across all three plant rooms, with a guarantee that installation costs would not exceed year-one savings.
Disruption
Total installation time of 2.5 hours.
Read the full case study
Clifftop hotel and spa · Newquay

The Headland Hotel

25%Fuel reduction
£54,191Projected annual saving
0 daysDisruption
The challenge
Heating and hot water costs across a large estate, including 40 holiday cottages.
What changed
Heating and hot water optimisation across the estate, phased in two stages around peak cottage lettings.
Disruption
No days of disruption, with installation worked around lettings.
Read the full case study

Savings are shown as stated in each published case study, measured or projected as labelled there. Results come from solutions we recommend and arrange through specialist partners.

Want results like these for your building?

Get a free, no-obligation Cost & Energy Waste Report, a limited-time offer, and we will show you where your building is losing energy and what it is costing you.